The Edge Basement Separate Entrance project in Waterdown, Ontario, presented a unique set of challenges, particularly during the excavation phase. Owing to the design where the basement walkout originated from the sideyard and wrapped around to the backyard, there was insufficient space for heavy machinery like an excavator to operate. This constraint necessitated that the entire excavation process be carried out manually, by hand.
Manual excavation is a labor-intensive and time-consuming process, requiring significant physical effort and precision. The team had to dig out the soil to create the pathway for the steps, ensuring that the depth and dimensions were accurate to the design specifications. This task demanded not only physical strength but also a keen attention to detail to maintain the integrity of the design and the safety of the structure.
The design involved steps commencing in the sideyard, descending to a landing, and then curving around into the backyard. This led down to another landing area, finally providing access to the basement. This intricate design required precise engineering and architectural planning, especially considering the limitations and potential complications of building around the existing foundation. The construction of such an entrance demands careful consideration of the structural integrity of the home, ensuring that the new construction seamlessly integrates without compromising the stability of the existing foundation.
Executing this project in the colder months added an extra layer of complexity. Winter construction in Ontario poses unique challenges, particularly when working with concrete. The cold climate necessitates the use of a specialized concrete mix, formulated to cure effectively in low temperatures. Standard concrete may not set properly or achieve the required strength in cold weather, so choosing the right material was crucial for the durability and safety of the entrance.
The project's completion in such challenging conditions demonstrated Northcon Corp's expertise and adaptability. The client was thrilled with the final outcome – a testament to Northcon Corp's ability to overcome the complexities of winter construction and deliver a high-quality, beautifully designed basement separate entrance. The Edge project in Waterdown stands as an exemplary case of innovative design, engineering excellence, and construction proficiency, culminating in a functional and visually stunning addition to the home.
External view of the completed Edge basement separate entrance in Waterdown, Ontario.
We'd love to hear from you! Please reach out at your convenience so we can discuss your basement separate entrance project.
Open today | 09:00 a.m. – 07:00 p.m. |
Closed on major holidays.
As we begin scheduling projects for Spring 2025, now is the perfect time to plan your basement renovation. Specializing in construction of basement separate entrances and basement window installations, we're committed to enhancing the functionality and aesthetic of your home. Don’t miss the opportunity to transform your space with us this upcoming spring!
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.